In a country where infrastructure is growing rapidly, fire safety is not just a legal requirement—it’s a critical responsibility. The UAE Civil Defense enforces strict standards to ensure all buildings, from residential towers to industrial complexes, are equipped with reliable fire fighting systems.

At Zahrat Alhibaa Technical Services LLC (ZATS), we specialize in designing, installing, and maintaining fire fighting systems that meet UAE fire safety codes and international standards. Whether you’re a developer, contractor, or building owner, here’s what you need to know.


🚨 Key Fire Fighting System Requirements in the UAE

1. 🧯 Fire Extinguishers

Requirement:
Portable fire extinguishers must be installed on every floor, with the type and quantity based on the building’s risk category (Class A, B, C, etc.).

ZATS Tip:
Always choose the correct type (CO₂, Dry Powder, Foam) and ensure they are regularly inspected and certified.


2. 🚿 Fire Hose Reels & Hydrants

Requirement:
Buildings over a certain size must be equipped with internal fire hose reels and/or external hydrants. Water pressure and flow must meet UAE Civil Defense guidelines.

ZATS Solution:
We design and install pressurized piping networks with fire pumps, valves, and hydrants to ensure instant access and compliance.


3. 💨 Fire Alarm Systems

Requirement:
A functional fire alarm system with smoke and heat detectors is mandatory for commercial, industrial, and most residential buildings.

ZATS Insight:
We integrate alarms with central monitoring systems and BMS (Building Management Systems) where required for added safety.


4. 🔥 Sprinkler Systems

Requirement:
Automatic sprinklers are required in high-rise buildings, warehouses, malls, hotels, and certain industrial facilities.

What We Offer:
From design to installation, ZATS provides NFPA-compliant sprinkler systems customized to your property’s structure and risk profile.


5. 🚪 Emergency Exits & Signage

Requirement:
Clearly marked emergency exits, exit lighting, and directional signs must be present and powered independently in case of power failure.

ZATS Compliance Check:
We ensure all signage and exit lighting complies with Civil Defense and ADA (where applicable) standards.


6. 💡 Fire Pump Rooms & Control Panels

Requirement:
Buildings using sprinkler and hose reel systems must have a dedicated pump room with main, standby, and jockey pumps.

Our Work:
We build fully compliant pump rooms with UL/FM listed equipment and smart control panels.


🛠️ Civil Defense Approval in the UAE

Before any system can be commissioned, it must be inspected and approved by the UAE Civil Defense. This includes:

ZATS handles end-to-end coordination with Civil Defense to ensure a smooth, compliant, and stress-free process.


✅ Why Choose ZATS for Fire Fighting Solutions?


 

📞 Need help with fire fighting compliance or a new system?
Contact us today for a free consultation or site visit.

Leave a Reply

Your email address will not be published. Required fields are marked *